Lidoran Infrastructure completed the roof replacement to four building across the Lady Davidson Hospital campus with Colourbond roof sheeting, flashings, gutters, downpipes and insulation. Hazmat materials were identified in the ceiling and roof cavity of the kitchen area. The ceiling and all asbestos and lead contaminates were removed and replaced with new gyprock sheeting and painting throughout. Electrical and fire services were upgraded and installed to meet code.